Friday, November 15, 2019

Reduce the concrete waste



For the abandoned fresh concrete in construction site, normally, it is dumped on site and griped to the landfill. It is obviously a waste of energy, material and cost in the process to produce, transport and dump it. Some foreman may give 1-200 HKD$ to the driver and illegally let the driver dump to other country part area, rural area for the villager to place in a car parting area,or fill the pond in rural area. 

I think there is a better way to improve it. Such as the government should make some precast mould in the construction project. So that we can make use of the abandoned fresh concrete. Like precast chair, breach... whatever creative product.
Or the client could open a WhatsApp group. A works supervisor in different construction site should show their contact in this WhatsApp group. They take responsibility to publicize the concrete pouring date and quantity of abandoned fresh concrete in the WhatsApp group. So that citizens can contact the driver to buy the “waste”. 

0 comments:

Post a Comment

waffle slab RC wall

原創 膠樽是很好的惰性物料,在無日曬下會十分耐用。 只要有工廠或機械自動裝沙機入膠樽, 那它可以當作為一定高度的檔土牆物料, 以減小石矢物料, 或,由於應該較少泥的特質, 所以作為擋土牆回填時的物料會減輕擋土牆的設計loading. 又或者室內批盪做間牆的...