Thursday, July 16, 2020

關於3色回收箱 About Waste Separation Bin(Bin)

未來:
* 本人見垃圾站有很多傢俬垃圾,到底可否安排木材回收商回收那些垃圾?
* 探討安排位置做廚餘降解試點,製造有機肥,是否符合成本效益。




希望改善屋苑管理, 以解決回收膠樽問題

現時, 屋苑的3色回收垃圾筒中, 清潔公司只把它們視作"需要移除的廢物". 好些清潔公司的管理方法是: 先派一個低工資的清潔工, 去把廢紙和金屬的垃圾拾起去回收, 而膠樽由於較不值錢, 就直接扔進普通垃圾中, 這樣就會最低成本處理完3色回收箱的垃圾。

相信這是不理會管理, 直接將垃圾回收直接全權交予清潔公司的結果。



然而, 其實回收廢紙和金屬回收本身是一種補貼來的。 在大廈間, 其實我們應該把3色回收筒判予另一間管理公司做, 並把3隻顏色的筒pack 在同一個筒中,並且需要清潔工在有監視的環境下分拆三色筒, 例如:

像圖中draft設計般, 

  1. 帶著9個空筒, 到每一層都換上裝滿的3色筒。或, (較慢較低成本) 

  2. 由屋苑出資, 在每一層垃圾間裝上閉路電視, 在每層中收集3色筒, 並抽樣檢查閉路電視中有沒有分類去清乾淨3色筒。(較快, initial cost 較貴) 

並且拿回收金屬和廢紙的所得去補貼清楚者的支出。

希望在意這份簡單的意見。


謝謝


以下係過去感言

---------------------------------------------------------------

在一個讀CS的blogger中學會原來製作報告的簡單方法是:

「以PP膠紙為例,一噸出口價大約一千元,可是由分解、破碎、清洗、拉粒,加上最基本的人工,成本至少需二千元,因此根本沒有人會處理,到最後便只能成為堆填物。」

HK01, 廢膠, 林立勝。

所以,香港政府機構廢膠回收是很差的。


Thursday, July 9, 2020

單向水閘果塊膠墊點解唔設計到凹凸狀?

Why isn't the gasket of single side gate valve be made like this

Monday, July 6, 2020

大部份工程公司常見問題(單面紙)

A0- A4都有,
假如好多工程公司太多單面影印ga紙張(想扔又唔環保)
,你作為一間私人公司,會建議攞D紙來做咩呢?

Wednesday, July 1, 2020

Reuse of backfilling material

冇睇spec...

印像中,GEO GUIDE 度話,石仔GA fiction angle 係細D,係較好ga backfill 物料。

但我地講3mm, 6mm aggrgate for backfill. 到底定義係乜野呢?
幾多%咩 size 謂之合格? 冇心情睇spec....
如果係一個range ga 話,會唔會整幾個網, sieve 左佢, 合格嘅就留低backfill? 
咁咪唔駛特登運走backfill 物料再運過來囉,會環保好多。

如果對backfill 物料希望有D requirement 果陣時。

Gabion construction

N年前,睇左幾份manual,但未有心情寫總結住。。。

Wednesday, June 24, 2020

可能係村民整出來ga渠蓋美化



其實渠蓋真係好岩做turf paver,相中係例子喇。

好多時,如果種岩草的話,係唔駛點剪ga.

Monday, June 22, 2020

古橋抄書

圖書館中借了本關於古橋 ga 書~ 翻小過10%大概就冇板權問題喇~
古橋書本欣賞, 為什麼古橋很喜歡用strip structure,但近代不喜歡了呢?
concrete strip structure 
* 明明就很方便,又可確定最critical 的mid span quality。
* 在廠可較易用標準方法控制質量
* 可以嘗試加入fibre reinforcement,省去鐵釘。
* 較易加入 retarder  或 acelerator

再延展的話,strip structure 甚至可以制作擋土牆。

你對呢條橋又有乜活化建議呢?
可以而家村橋可能唔再起more than one span(之前在某些區工作時聽說)
否則mid support可以整一整破水,復古風。

草泥灰又係乜9,揾個有D年紀ga麻甩佬來講下~






Wednesday, June 17, 2020

公園設計

找survey 度數時,不妨先準備完layout plan 先,
再諗下邊D位想知道個size 同level ga,叫佢度埋,之後比較唔駛翻手。

Friday, June 12, 2020

Experience of the notice board project

圖:
* 其實,同類型嘅工作,最好係有Location plan ga, 係為左比人知道工地位置嘅情報,如果地圖範圍太大,可考慮用1:5000的圖則(我未用過),如果冇,亦可考慮直接去MyMapHK capture 想要嘅地圖scale, 否則,出車前,如果對地方本身唔係熟悉嘅話,都係要整張location plan 去知道點樣用最少路線行哂所有位置。 又可以比判頭佑道位置與位置間的距離,訂定工程順序。
工料
* 應該係岩嘅:唔夠6mm厚嘅鐵板唔好用6m thick 焊支,否則會辣熔鐵板或損害結構。(有Dstruct E話係,但唔sure 點解好多部門照寫)
* 膠板需要UV resistance,唔係想擋UV(咁就會冇咁光),而係想令膠板在日曬雨淋下唔會變白,唔透明。
* 確保膠板質量果度,咁當然Delivery note 同物料spec,並在信中聲明所有所用物料係跟spec 同delivery note 啦, 但其實我覺得如果要監控,各區或總部最好買一個UV resistance 嘅 polythene carbonate catalogue,講哂每一種物料嘅型號,spec,同埋sample,唔駛次次攞。咁就可以出去果陣對貼紙同埋對塊膠板喇。
* 超聲波探測器係需要調較到音速5900m/s^-1 for steel 嘅,唔知會唔會有人無留意到,其實我唔太sure 厚度準唔準,但佢cal cert 話佢好準...
就算準,超聲波呢類機,部機設計應該用彈弓頭,確保每一面都受力平均,否則好多時,
按壓得較輕或較斜就會較厚,其實呢個工程質量問題一直存在。
(Ultrasound detector should design an elastic detector head, to ensure that the compressing stress of the detector head is uniform. Or it is a problem for long that when detector head is lightly separate or inclined to the metal surface, the thickness of the metal would be changed. And supplier generally supplies metal with 1-2mm thinner showing that the technical nowadays can make a metal plate to the 1mm accuracy.
* 展示finish floor level 要好好咁考慮,係咪個個都係咁,有冇D唔想要石矢面,想要paving block 面。
* 可能最好係notes 度加一句: post would be moved horizontally on site,  and have a footing with mininum cover of 100 mm.  When the cover of the post is smaller tham 200mm,  U steel bar should be added at 200c-c at that 3 sides horizontally and 1 side vertically. 咁移動footing 時就會有根據。
* 要鎖嘅地方最好即刻上鎖, 或包住, 否則會比d陌生人自已加個鎖上去。。。


Tuesday, June 2, 2020

bridge railing設計考慮




When only one side of railing is allowed in rural bridge construction,  which is preferred?

It should be with the same direction when it is under 退潮. When it durects to right,  build upon right. 

When you know this question before seeing the answer,  you got one of the potential as a Senior Inspector. 

Thursday, May 21, 2020

What is the mechanism behind slump test? Why can't we improve it?


Job Site Slump Cone Test Set
We use the traditional method to test concrete slump by~ slump cone, temp rod, and steel plate.
As the final purposes of these tools are for compacting concrete.

Would we use a vibration container to replace these traditional processes?
It would save a technician as the concrete slump test timing would be just by several bottoms
and it would ease the slump making and test cubes process.

We might even automatize the slump taking process.

https://qr.ae/pNyWnO


This site uses cookies from Google to deliver its services and analyze traffic. Your IP address and user-agent are shared with Google along with performance and security metrics to ensure quality of service, generate usage statistics, and to detect and address abuse.

Wednesday, May 20, 2020

粗略翻譯合約

<每日翻譯一部份合約>


今期總結: 

根據(2) 工程師以下的人,當認為有完成工程的必要性時,可給予判頭指示。 (例如坐判頭車去進行工程或物料的監察。。。)



由於對工程管理唔太熟,打算簡譯哂成份合約先。

Engineer =工程師 Engineer’s representative =工程師代表


2。 (1)  工程師代表負責係該單工程中,去睇同埋管理工藝質素以及測試和試驗被用的物料。他們無權解除承包商的任何職責或義務。


(2) 工程師和其代表可以安排任何人去幫忙(1)所提及的事項。 他需要告知判頭 該幫助人的名和作用, 他冇權去給予判頭指示除非該指示有令他們做到他們工作的必要性和確保物料和工藝有根據合約要求。他們給的指引等同工程師代表的指引。


(3)工程師可以給予他既得的權力工程師代表,去方便工程進行得更有效率。除非這些權力不能下放,參考clause 12(3),vested 46, 48, 51, 68, 71,除非這些clause是批准的。工程師需要提供給判頭書面知會被下放的權力。

任何工程師代表的指引或同意書關於這些下放權力的事項需要放在合約上。

(a)工程師代表不能成功否決任何工程或物料的話,不能對工程師的權力造成偏見去否決物料或拆掉那些物料的建築。

(b) 判頭可以有理由地對工程師代表呈交工程師的問題表達不滿,令工程師改變或保留該決定。






Friday, May 15, 2020

房間牆方法探討




用磚間房其實好傻, 因為石矢間黏力唔大, 幅牆變相要厚好多,
先可以受到推力。

實際上,應該用角鐵碼住天花同地下, 再上實塊木板。

但我想不到門嘅設計方法。
我覺得橫拉門會較省位。


Wednesday, May 6, 2020

wall art shelter

正面用植物formwork,  背面就比年青人畫牆畫。
A shelter which let peole paint on the back.
And use grass to make formwork on the front. 
Glass formwork example

Tuesday, May 5, 2020

讀書嘅時侯,對R.C.計算的另一種見解(入計數機,省去計moment 同shear時間)

我structure research到呢到la,做個TO唔駛呢D野。。。
呢條formula 嘅用途可能係,可以直接入數落計數機,用member size 同reinforcement area 計返moment同shear. 打破傳統要寫成條式去計。
With a formula to calculate the moment and shear after entering the member size and reinforcement area. So that we would calculate moment and shear capacity just by the calculator.
3年前,

For double reinforcement
計算R.C. 的逆公式
M=Asc*0.87*fy*(d-d')+k'fcu*b*d^2
k'=0.156 when fcu = 30
depend on fcu, k'=lower with higher grade of concrete
(divided both sides with b*d^2
M/bd^2=Asc/bd*0.87*fy*(1-d'/d)+0.156fcu
呢條應該就係房署個chart嘅formula la~
當知道compassion steel 的area 時,就可以知道beam的moment。
而tension steel 的formula 是:
Ast=k'*fcu*b*d^2/(0.87fy*z)+Asc


我覺得應該用reinforcement 去計番個moment,
因為moment 可以係任何數字,而b,d 同R.C. 個組合係有限ga。
咁就可以generate 一張張紙,用reinforcement 個數,對住張紙來揾moment 係幾多,
但變數太多了...

例如考慮睇housing 呢個圖,直接知moment 就對表,揾R.C. ratio 係乜野,咁就唔駛計。 就算roughtly,  都可以估到個member size 要幾多% Reinforcement或者如果想2% reinforcement ,咁咩member size 先okay. 

Shear force 都可以比完鐵之後再睇max shear force 夠唔夠,唔駛design 到一半又重頭計過。
當beam 本身嘅shear stress load 大過vc
vc=0.79(100As/(bd))^1/3*((400/d)^(1/4))*((fcu/25)^(1/3))/1.25

(100As/(bd))^1/3
{should be <3}        

((400/d)^(1/4))
>0.67(when no shear reinforcement)
>1 (when has shear reinforcement)

咁就要
入shear reinforcement area, bv同Sv, 計返maximum shear capacity
0.87Asv*fyv/(bv*sv)+vc
跟番manul of design and detailing of reinforced concrete 3.7.1


第2條moment 嘅formula 唔知有冇用:
z/d=0.5+(0.25-k/0.9)^0.5 ...(1)
Ast=M/(0.87fy*z)            ...(2)
Combined (1) & (2)
0.87fy*Ast*d-(0.87fy*Ast)^2/(0.9b*fcu)

我structure research到呢到la,做個TO唔駛呢D野。。。

waffle slab RC wall

原創 膠樽是很好的惰性物料,在無日曬下會十分耐用。 只要有工廠或機械自動裝沙機入膠樽, 那它可以當作為一定高度的檔土牆物料, 以減小石矢物料, 或,由於應該較少泥的特質, 所以作為擋土牆回填時的物料會減輕擋土牆的設計loading. 又或者室內批盪做間牆的...